Project Overview:
SafeSite Facilities was engaged to install a secure barrier system to facilitate a safe public walkway while essential construction works were being carried out on the pedestrian footpath. Our client, a leading traffic management company, requested the works to be completed on a high-traffic route in Lincoln. Due to the volume of daily traffic, the installation had to be performed outside of peak hours, with stringent safety measures and tight timeframes for completion.
Client Requirements:
The primary objective was to ensure the safety of pedestrians while allowing construction works to take place without compromising public access. The client selected the Manta Steel Barrier 1.5m long in red and white for several reasons:
Challenges:
Solution:
SafeSite Facilities was able to deliver the project within the required timeframe by adhering to the following steps:
Outcome:
The installation of the Manta Steel Barrier system was completed successfully within the required timeframe, and the public walkway remained secure throughout the construction period. By working closely with the client and adhering to strict safety protocols, SafeSite Facilities ensured minimal disruption to both pedestrians and traffic.
The project was carried out with a strong focus on safety, efficiency, and quality, leaving the client satisfied with the results and confident in the safety of the public walkway during the course of the essential construction works.
Client Feedback:
Our client expressed their satisfaction with SafeSite Facilities’ professionalism and ability to meet strict time constraints. The quick and efficient installation of the secure barrier system contributed to the smooth progress of the construction work and helped ensure public safety during a critical phase of the project.
Conclusion:
SafeSite Facilities demonstrated its ability to respond to tight deadlines and complex challenges while maintaining high standards of safety and quality. This project highlights our expertise in barrier installation and our commitment to providing safe solutions for both public and worker safety in high-traffic areas.