SafeSite Facilities were instructed to deliver a traffic calming solution along a road leading up to a site in Birmingham.
The site was experiencing high levels of vehicle movement, including HGV deliveries, contractor traffic, and plant machinery operating within confined access routes. This created an increased risk of speeding and unsafe vehicle movements at key entry points and throughout internal circulation areas.
A temporary but robust solution was required to:
SafeSite Facilities supplied and installed a system of 25 heavy-duty speed ramps with end stops across along the stretch of road.
The solution included:
The system was selected to provide immediate traffic calming impact without the need for permanent works or excavation.
We carried out the installation in a carefully managed programme to ensure full site operations were maintained:
The modular system allowed for efficient installation and flexibility as site conditions evolved.
SafeSite Facilities successfully delivered a traffic calming solution along a roadside leading up to a site in Birmingham through the installation of 25 speed ramps.
The system provided an effective, rapid-deployment approach to managing vehicle speeds in a busy construction environment, improving safety while maintaining operational efficiency.
This project highlights SafeSite Facilities’ capability in delivering practical, temporary traffic management solutions tailored to complex and high-traffic construction sites.