The following case studies highlight some of the recent projects carried out by Safe Site Facilities. If you have any questions regarding any of the case studies listed below please feel free to contact us. Or if you're a customer of ours, please feel free to submit a product review.

London Supermarket Refurb – 3m Concrete Barriers – London Supermarket Refurb

Concrete Blocks around London Car Park

The Brief: Involved in a refurbishment of a supermarket and car park, our client in London required a robust system offering protection for workers and pedestrians from large vehicles and lorries entering and moving around the site. With heavy goods and forklifts operating they needed a sturdy and health and safety compliant barrier system in place.   The Solution: We delivered and installed 9 x of our 3 meter Concrete Block Barriers around the perimeters of the area where the…

Evo Water Filled Barriers for Shipping Port – Lincolnshire

Evo 80 Barriers at Shipping Port

The Brief: Our client at a shipping port in Lincolnshire, was running a repair on some of the loading and delivery bays, including renovation works to the tarmac inside the port. Damage had occurred overtime to the surface of the port due to large heavy good vehicles frequently operating. They had their own traffic cones but needed something more robust to map out a clear delineation that they could deploy quickly.   The Solution: SafeSite suggested our Evo 80 Barriers…

Evo 80 Barriers to Secure Waters Edge – Grimsby Dockyard

Protecting waters edge with Evo 80 water filled barriers

The Brief: Our client had an operation ongoing at a dockyard in Grimsby. A new, safer pontoon was being built and the contractors needed a safe space to load, manoeuvre and commence works.  They needed to safely mark out pathways alongside the original pontoon and the space as to where the new pontoon was being constructed. A space just before the waters edge also needed to be cordoned to prevent accidents. The cordoning needed to be easily seen, chapter 8…

Temporary Fencing for Old Farm Building Security

Heavy duty temp fencing on farm

The Brief: A client had an old Farming warehouse that was no longer in use and needed building works to take place. The client needed to keep the building clear and empty and prevent people gaining entry. They required temporary fencing around the building and other parts of the site too, such as the duck pond to secure the area and preventing unwanted access while the areas are vulnerable.   The Solution: Identifying the most cost-effective solution; as the site…

3m Concrete Blocks Protecting Entrance – Bicester

3m Concrete Blocks - Entrance Protection

The Brief: Our client, a building and construction company, requested our help with their current site in Bicester.  A new commercial building unit had been constructed and they needed to secure access pending occupancy. As the site was vacant, it was imperative the works were carried out quickly and the site left secure.   The Solution: We supplied and installed 4x 3m Concrete Blocks to the entrance of the new commercial site. Each of the concrete barriers weigh 2 tonnes,…

RB22 + Mesh Extensions for Building Works Project – Bristol

RB22 Barriers with Mesh Extensions

The Brief: In Bristol, a client of ours was in the process of a building works project on a busy side street. The client had a skip delivered and needed to keep it in a compound safely away from road users and pedestrians. The client needed something both sturdy yet tall enough to be able to hide the skip at risk of attracting attention from possible vandals.   The Solution: SafeSite Facilities were to deploy and install RB22 Water-Filled Barriers…

Safe Mats for Archaeological Dig – Birmingham

Safe Mats Ground Protection Mats

The Brief: Our client, an archaeological society in Birmingham; required plant and dumper trucks to gain access to an already boggy ground. An archaeological dig was underway, and they needed the lorries to gain access without getting stuck in the mud and causing damage to the landscape.   The Solution: We provided and installed 8 x SafeMats to the site, to cover the slippery wet ground. This enabled the vehicles needing to be present at the archaeological dig, to gain…

CCTV & ANPR System Install and Commission – Wiltshire

ANPR CCTV Cameras

The Brief: A returning client required our help with CCTV at their car valeting and cleaning business. They needed to keep track of cars coming to use their services and to deter possible intruders when the service is left unattended overnight. They required a standalone system that can record, play back on its own device and store data regarding frequent customer types and usage.   The Solution: SafeSite Facilities team of highly skilled engineers commissioned a bespoke system allowing for…

Blocking Loading Bay with RB22 Barriers – London

RB22 barriers blocking loading bay

The Brief: Our client needed to have a loading bay blocked off next to a busy main road in London Marylebone. The loading bay was outside a popular museum, meaning foot traffic would also be particularly heavy. The client needed a safe area to be cordoned off so works on the roof of the museum could take place, preventing parking by road users and contractors needing to unload.   The Solution: The team deployed highly visible water filled RB22 water…

Mobile Lighting Towers and Perimeter Fencing – Madehurst Big Night Out

Madehurst Big Night Out

The Brief: Our customer required perimeter security fencing for Big Night Out, a popular music festival which took place at Madehurst Cricket Club. Their purpose for contacting Safe Site was to secure the perimeter to avoid unwanted entry and provide additional security measures for the site.   The Solution: We provided 600 metres of Heavy Duty Anti-Climb Fencing to secure the perimeter of the event as well as 100 metres of Chapter 8 Safe Site Gate Barriers for the demarcation…